Flashback: Train Room Tetris
After a long time, the work on the new layout finally began almost a year ago. The shape of the layout is roughly a W. The sides are going up the entire length of the walls. One side will have …
After a long time, the work on the new layout finally began almost a year ago. The shape of the layout is roughly a W. The sides are going up the entire length of the walls. One side will have …
2021 is behind us by over a month already It’s hard to believe how fast such a busy and eventful year can end. The bad news is that not a whole lot has happened in the train room this past …
Recently I found the time to start on a little project that has been going through my head for a while. I wanted to build a separate test track, in a manner of speaking, which could be easily connected to …
After a week of straight work, with a few disruptions and two trips to the hardware store, the frame for the new train room is finished. Where the first day saw fast progress, things slowed down a bit over the …
It was always sort of planned that at some point, our model trains would move elsewhere. The room we used until now is quite small, and while we managed to maximise space usage in it, actually working in there was …